State Road (SR) 25/US 27/Okeechobee Road Corridor Wide Updates

 

Below is a list of ongoing construction activities and lane closure information for each project segment.

Real time traffic alerts and incident reports will be included as necessary to keep the traveling public informed. 

 

To download a copy of this week's email blast or to view previous ones, click here.

 

 

ONGOING CONSTRUCTION ACTIVITIES

 

 

SEGMENT TWO: 423251-5 From east of NW 107 Ave to east of NW 116 Way/Hialeah Gardens Blvd

 
  • Performing roadway widening and drainage installation work along Okeechobee Rd, NW 116 Way/Hialeah Gardens Blvd, NW S River Dr, NW 121 Way and Frontage Rd
  • Installing the following:
    • Bridge walls
    • New pump station on NW 121 Way
    • Service points along Frontage Rd
    • Concrete pavement and light poles along Okeechobee Rd
  • Pile driving operations and bridge construction at:
    • Hialeah Gardens Blvd just north of Frontage Road
    • Okeechobee Rd and NW 98 Ave
    • Okeechobee Rd and NW 114 St
    • Okeechobee Rd at the NW 116 Way intersection
    • NW 121 Way Bridge - continuation of demolition
 
 
General Lane Closures
 
  • A single lane closure along NW 116 Way from Frontage Rd to W 68 St, in both the northbound and southbound direction
  • A single lane closure along Okeechobee Rd from NW 92 Ave to NW 107 Ave, in both the northbound and southbound direction
 
Closures will take place Monday through Saturday during the following hours:
 
  • 9 p.m. to 5:30 a.m. on weekdays
  • 11 p.m. to 7:30 a.m. on weekends

 

Continuous Lane Closures/Traffic Shifts

  • Travel lanes are reduced to two lanes in each direction along the NW 116 Way bridge between Okeechobee Road and NW South River Drive. 
  • Traffic lanes are reduced to two lanes in each direction along Okeechobee Road from east of NW 107 Avenue to NW 92 Avenue.
  • Full closure of NW 121 Way Bridge.

 

PLEASE NOTE THAT SCHEDULES MAY CHANGE DUE TO WEATHER OR UNEXPECTED CONDITIONS.

 

 

 

ONGOING: NIGHTLY CLOSURE OF NORTHBOUND LANES AT THE

SR 25/US 27/OKEECHOBEE ROAD AND NW 116 WAY INTERSECTION

 

The northbound lanes at the SR 25/Okeechobee Rd and NW 116 Way intersection are closed nightly from 9 p.m. to 5 a.m. This allows crews to continue pile driving efforts for the construction of the overpass. 

 

 

CURRENT TRAFFIC PATTERNS AND LANE CLOSURES

 

 

Plan your commute! Click HERE to view the corridor wide traffic patterns and lane closures.