Project Summary
The Florida Department of Transportation (FDOT) is developing the design for a roadway project along State Road (SR) 94/SW 88 Street/North Kendall Drive from west of SW 92 Avenue to SW 9100 Block, in Miami-Dade County.
WORK TO BE PERFORMED:
-
Converting the full median opening at SW 92 Avenue to a westbound left turn median opening
-
Converting left turn lane on SW 92 Avenue to additional right turn only lane
-
Widening on Eastbound Kendall Drive at 9100 block to implement U-turn only lane
-
Installing new traffic signal to accommodate for new U turn lane at SW 9100 Block
-
Repaving and restriping the road
MAINTENANCE OF TRAFFIC
During construction, temporary lane closures during non-peak hours and detours may affect traffic. Access to adjacent businesses and residences will be maintained.
FDOT will host a Hybrid (In-Person and Online) Public Meeting for those interested in learning more about this design project.
Time and Date:
Tuesday, July 23, 2024, starting at 6 p.m.
Location:
In-Person Meeting:
Kendall Branch Library 9101 SW 97 Ave, Miami, FL 33176.To register, click here.
Virtual Meeting:
Visit the link to attend: https://attendee.gotowebinar.com/register/7123598837134830684.
Participants can also call in by dialing +1 (631) 992-3221; Access code: 147-975-090.
Project At-A-Glance
Construction Start Date |
---|
February 2028 |
Construction Cost |
$467,984 |
Lengths and Limits |
State SR) 94/SW 88 Street/North Kendall Drive from west of SW 92 Avenue to SW 9100 Block |
FDOT Project Manager |
Victoria Zulueta, P.E. |
Consultant Project Engineer |
Favio Laverde, P.E. TRACE Consultants, Inc. |
Community Outreach Specialist |
Jose Ignacio Grados Infinite Source Communications Group C: 786-537-3363 O: 305-470-5477 Josei.grados@dot.state.fl.us |