Welcome
The Florida Department of Transportation (FDOT) is developing the design for an intersection project located at State Road (SR) 5/US 1/S Dixie Highway and SW 37 Avenue, in Miami-Dade County.
WORK TO BE PERFORMED:
- Reconstructing sidewalks and curb ramps
- Replacing signage
- Adding new flashing left turn traffic signals
- Extending the median to allow more storage for vehicles turning left
MAINTENANCE OF TRAFFIC
During construction, temporary lane closures and detours will have effects on traffic. Pedestrian detours will be established with clear signage. Access to adjacent businesses and neighborhoods will be maintained.
Project At-A-Glance
Construction Start Date |
---|
November 2026 |
Construction Cost |
$315,749 |
Lengths and Limits |
SR 5/US 1/S Dixie Highway at SW 37 Avenue |
FDOT Project Manager |
Auraliz Benitez, P.E. |
FDOT Consultant Project Manager |
Frank Panellas, P.E. Trace Consultants, Inc. |
Community Outreach Specialist |
Jose Ignacio Grados Infinite Source Communications Group O: 305-470-5477 C: 786-537-3363 |