- Project Resources
- Documents and Publications
- Contact Us
- Lane Closures
![MyFL511 Site Link](https://www.fdot.gov/webtools_images/511.jpg)
The Florida Department of Transportation (FDOT) is developing the design for a roadway project located at SR 860/Miami Gardens Drive at the intersection of NW 37th Ave and from NE 6 Avenue to West of NE 10 Avenue, in Miami-Dade County.
WORK TO BE PERFORMED:
- Installing a new traffic signal and upgrading the existing traffic signals at the intersection of NW 37 Avenue
- Repaving and restriping the road from NE 6 Avenue to West of NE 10 Avenue
- Upgrading the existing pedestrian crosswalk at the intersection of NE 6 Avenue
MAINTENANCE OF TRAFFIC
During construction, temporary lane closures and detours will have effects on traffic. Vehicular and pedestrian detours will be established with clear signage. Access to adjacent businesses and neighbourhoods will be maintained.
Construction Start Date |
---|
April 2027 |
Construction Cost |
$1.7 million |
Lengths and Limits |
SR 860/Miami Gardens Drive at NW 37 Avenue and from NE 6 Avenue to West of NE 10 Avenue |
FDOT Project Manager |
Claudia Gutierrez P.E |
Consultant Project Manager |
Diego Quintero P.E Roadway Design Solutions |
Community Outreach Specialist |
Jose Ignacio Grados Infinite Source Communications Group C: (786) 537-3363 O:305-470-5477
|