The Florida Department of Transportation (FDOT) is developing the design for a roadway project located along SR 7/NW 8 Avenue/NW 7 Avenue from NW 3 Street to NW 8 Street, in Miami-Dade County.
WORK TO BE PERFORMED:
- Removing two abandoned driveways located at 722 NW 7 Avenue and 600 NW 7 Avenue
- Repaving and restriping the road
- Improving sidewalk and curb and gutter
- Enhancing signage
- Replacing pavement markings
- Upgrading pedestrian signs
MAINTENANCE OF TRAFFIC
During construction, there will be temporary lane closures during non-peak hours and detours will have effects on traffic. Pedestrian detours will be established with clear signage. Access to adjacent businesses and neighborhoods will be maintained.
Construction Start Date |
---|
September 2025 |
Construction Cost |
$1.5 million |
Lengths and Limits |
State Road (SR) 7/SW 8 Ave/NW 7 Ave from NW 3 St to NW 8 St |
FDOT Project Manager |
Patricia Quintela, P.E. |
Consultant Design Project Engineer |
Jorge Pena, P.E. Alfka - Lean - Innovative - Engineering |
Community Outreach Specialist |
Jose Ignacio Grados Infinite Source Communications O: (305) 470-5477 |