Project Summary
The Florida Department of Transportation (FDOT) is developing the design for a roadway project along State Road (SR) 5/US 1/Biscayne Boulevard from SR 915/NE 6 Avenue to NE 105 Street, in Miami-Dade County.
WORK TO BE PERFORMED:
- Construct a crosswalk at the intersection of SR 5/US 1/Biscayne Blvd and NE 91 Street
- Upgrading pedestrian facilities including sidewalks and crosswalks
- Enhancing traffic signals at the intersections
- Repaving and restriping the road
MAINTENANCE OF TRAFFIC
During construction, temporary lane closures and detours will have effects on traffic. Vehicular and pedestrian detours will be established with clear signage. Access to adjacent businesses and neighborhoods will be maintained.
Construction Start Date |
---|
April 2026 |
Construction Cost |
$2.5 million |
Lengths and Limits |
SR 5/US 1/Biscayne Boulevard from SR 915/NE 6 Avenue to NE 105 Street |
FDOT Project Manager |
Carmen Bermudez, P.E. |
Consultant Project Manager |
Shelley Ortiz, P.E. Highway Studio, LLC. |
Community Outreach Specialist |
Jose Ignacio Grados Infinite Source Communications Group O: 305-470-5477 C: 786-537-3363 |