The Florida Department of Transportation (FDOT) is developing the design for a landscape project along NE 203 Street from SR 5/US 1 to W Dixie Highway, in Miami-Dade County.
WORK TO BE PERFORMED:
- Adding landscape
- Installing irrigation equipment and connecting to the existing system
MAINTENANCE OF TRAFFIC:
During construction, temporary lane closures during non-peak hours. Access to and from adjacent neighborhoods and businesses will be maintained.
Project At-A-Glance
Construction Start Date |
---|
October 2024 |
Construction Cost |
$895,478 |
Lengths and Limits |
NE 203 Street from SR 5/US 1 to W Dixie Highway |
FDOT Project Manager |
Monica Rodriguez |
FDOT Consultant Landscape Architect |
Geoffrey Campbell, RLA KEITH |
Community Outreach Specialist |
Jose Ignacio Grados Infinite Source Communications Group O: 305-470-5477 C: 786-537-3363 JoseI.Grados@dot.state.fl.us |