The Florida Department of Transportation (FDOT) is developing the design for a roadway project along State Road (SR) 5/US 1/North Roosevelt Boulevard from Eisenhower Drive to South Roosevelt Boulevard, in Monroe County.
WORK TO BE PERFORMED:
- Adding pedestrian countdowns to the existing pedestrian signal poles
- Updating curb ramps and sidewalks
- Replacing signage
- Trimming or relocating landscape
- Repaving and restriping the road
MAINTENANCE OF TRAFFIC
During construction, temporary lane closures during non-peak hours and detours may affect traffic. Vehicular and pedestrian detours will be established with clear signage. Access to adjacent businesses and residences will be maintained.
Public Meeting:
Construction Start Date |
---|
September 2025 |
Construction Cost |
$5.2 million |
Lengths and Limits |
SR 5/US 1/North Roosevelt Boulevard from Eisenhower Drive to South Roosevelt Boulevard |
FDOT Project Manager |
Joaquin de la Cruz, P.E. |
Consultant Project Manager |
Rafael Aguilar, P.E. Choice Engineering |
Community Outreach Specialist |
Jose Ignacio Grados Infinite Source Communications O: 305-470-5477 C: 786-537-3363 |