The Florida Department of Transportation (FDOT) is scheduled to begin a roadway project the week of June 10 along SR 916/NW 135 Street/NW 136 Street from west of NW 30 Avenue to east of NW 27 Avenue in Miami-Dade County.

WORK TO BE PERFORMED

  • Shifting the westbound Opa-locka Boulevard entrance further west to enhance safety
  • Adding an additional eastbound left turn lane at the intersection of SR 916/NW 135 Street and NW 27 Avenue
  • Upgrading crosswalks at the following intersections:
    • SR 916/NW 135 and NW 27 Avenue
    • SR 916/NW 135 and NW 30 Avenue
    • Opa-locka Boulevard and NW 27 Avenue
  • Improving drainage along the project limits
  • Adding school zone signage and pavement markings
  • Reconstructing sidewalks and pedestrian ramps at various locations
  • Upgrading pedestrian signage and signals
  • Upgrading pedestrian railing on northbound and southbound NW 27 Avenue adjacent to the Opa-locka Canal
  • Adding vehicle detection video equipment 
  • Installing pavement traffic detectors
  • Installing countdown pedestrian signals at various locations
  • Repaving and restriping the road within the project limits

LANE CLOSURE INFORMATION
Travel lanes and sidewalks will be closed during non-peak hours on non-event days. Non-peak hours are:

  • 9 a.m. to 3:30 p.m. weekdays and weekends
  • 8:30 p.m. to 6:30 a.m. weekdays and weekends

Note: Drainage work might require weekend daytime closures from 9 a.m. to 5 p.m.

DETOUR INFORMATION
Pedestrian and vehicular detours will be established at times and may exceed past the non-peak lane closures hours. Specific detour information will be provided before the corresponding construction activity is scheduled.
 

Project At-A-Glance
 
map
Start Date
June 2024

Est. Completion
Early 2025

Construction Cost
$3.3 million

Lengths and Limits
State Road (SR) 916/NW 135 Street/NW 136 Street from west of NW 30 Avenue to east of NW 27 Avenue

FDOT North Dade Resident Engineer
Ivan Hay, P.E.

FDOT North Dade Assistant Resident Engineer
John M. Garzia, P.E.

FDOT Project Manager
Igor Caicedo

Community Outreach Specialist
Miranda Brito
Holt Communications, Inc.

O: (786) 837-4884
C: (786) 774-9714
Miranda.Brito@dot.state.fl.us.
 

×