Key Largo Roadway enhancement Projects (S.R. 5/U.S. 1) Restoration, Rehabilitation and Resurfacing Projects

 

Project Limits

 

Project Summary
These projects will include drainage enhancements with swales, upgraded curb ramps to comply with Americans with Disabilities Act standards, new signage and pavement markings, rehabilitation of the southbound outside shoulder to provide an 8’-10’ shoulder with 4’-5’ paved, rehabilitation of the northbound outside shoulder, as noted above, to provide a 10’-12’ shoulder with 10’ paved and resurfacing bike path and enhance crossings on the northbound (Ocean) side of the project with updated safety features. Once completed, these projects will enhance safety and enhance traveling conditions for motorists and pedestrians.

 

Project Team:

FDOT District Design Engineer:

Harold Desdunes, P.E.

 

Chris Tavella – Project Manager
 FIN # 419849-1 (MM 92 to MM 93)

Erenia Nagid – Project Manager
FIN # 419848-1 (MM 93 to MM 97)
FIN # 419859-1 (MM 100 to MM 103)
FIN # 419846-1 (MM 103 to MM 106)

Adriana Manzanares – Project Manager
FIN # 419853-1 (MM 97 to MM 100)

 

Public Information

Marta Rodriguez-Trudeau
305-470-5873