Key Largo Roadway enhancement Projects (S.R. 5/U.S. 1) Restoration, Rehabilitation and Resurfacing Projects
Project Limits
- Mile Marker 92 to Mile Marker 93 (Project No. 419849-1-52-01) – Southbound only Mile Marker 93 to Mile Marker 97 (Project No. 419848-1-52-01)
- Mile Marker 97 to Mile Marker 100 (Project No. 419853-1-52-01)- Southbound with exception of north of Ocean Bay Drive to MM 100
- Mile Marker 100 to Mile Marker 103 (Project No. 419859-1-52-01)
- Mile Marker 103 to Mile Marker 106 (Project No. 419846-1-52-01)
Project Summary
These projects will include drainage enhancements with swales, upgraded curb ramps to comply with Americans with Disabilities Act standards, new signage and pavement markings, rehabilitation of the southbound outside shoulder to provide an 8’-10’ shoulder with 4’-5’ paved, rehabilitation of the northbound outside shoulder, as noted above, to provide a 10’-12’ shoulder with 10’ paved and resurfacing bike path and enhance crossings on the northbound (Ocean) side of the project with updated safety features. Once completed, these projects will enhance safety and enhance traveling conditions for motorists and pedestrians.
Project Team:
FDOT District Design Engineer:
Harold Desdunes, P.E.
Chris Tavella – Project Manager
FIN # 419849-1 (MM 92 to MM 93)
Erenia Nagid – Project Manager
FIN # 419848-1 (MM 93 to MM 97)
FIN # 419859-1 (MM 100 to MM 103)
FIN # 419846-1 (MM 103 to MM 106)
Adriana Manzanares – Project Manager
FIN # 419853-1 (MM 97 to MM 100)
Public Information
Marta Rodriguez-Trudeau
305-470-5873
Marta.rodriguez@dot.state.fl.us